Seatop Services
SeaTop modular steel-frame builds are completed in 6–12 weeks versus 7–12 months for traditional builds. The vertical build — including shell, labor, and MEP (Mechanical, Electrical, Plumbing) — costs ~50% less compared to conventional construction.
Our modular homes can also be built as SeaTop Pillar Homes, elevated above floods, erosion, and steep terrain.

Vacation Rentals
Steel-frame modular units can be built on foundations or on helical piles, eliminating the need for excavation or leveling. Resistant to floods, stable on uneven ground, and scalable from ADUs to entire communities. Delivered in weeks at roughly half the cost of conventional construction.

Architecture & Engineering Services
Seatop’s engineering team works with developers, municipalities, and innovators to design, test, and bring new ideas to life. Whether it’s architectural, structural, MEP, water technologies, or entirely new inventions, we provide the expertise to develop, build, and deliver solutions.